Sunday, March 7, 2021

2021 Maintenance

Pardon me once again for the administivia. I like to keep this information at my fingertips as I am constantly referring to it and would hate to ruin a good trip with having to work on the boat in some far off port.

Yanmar 3GM30F - 1900 hours - 01/01/2021

March:

  • Haulout
  • New propeller: 15" RH 13 MPBR
  • PYI PSS Shaft Seal 1" FWD 1-1/2" Stern Tube
  • Cutless Bearling
  • Installed 2 Zincs
  • Needle gunned keel plate
  • Re-torqued new nuts and washers on keel studs
  • Bilge Corroseal, Rustoleum Professional enamel paint with hardner
  • New brackets for bilge pump, float switch
  • Reattached ground strap in bilge
  • Epoxied keel join w/3 layers glass, 2", 4" and 8", faired.
  • Bottom paint, prepped by sanding down to fiberglass
  • Rudder gudgeon renewed
  • Rudder fiberglass and epoxy faired
  • Steering cables inspected and clamps replaced
  • Installed new throttle govener

May:

June:

  • New Jabsco marine head pump assembly

July:

  • Installed new Garmin GT15M-IH Transducer

To do list:

  • Gelcoat deck
  • Seal forward toe rail drain holes.
  • Add 1/4" aluminum backing plates to toe rails.
  • Refrigeration
  • Diesel Heater
  • Shrouds
  • Mast wiring conduit
  • Optimize solar panels

2020 maintenance »

2019 maintenance »

2018 and earlier maintenance records »


No comments: